National Repository of Grey Literature 10 records found  Search took 0.01 seconds. 
Air-conditioning of Department store
Chorý, Vojtěch ; Rubina,, Aleš (referee) ; Rubinová, Olga (advisor)
The topic of this bachelor thesis is design of air-condition equipment for veterinary clinic. The clinic is located on the first floor of a multifunctional building in Brno city. For design purposes is used warm-air heating, air-conditioning and forced air-replacement. The theoretical part is focused on clean room issue. The Project part contains a project documentation for realization of two air-conditioning equipment. The first air-conditioning equipment is designed for warm-air heating and air-conditionig of clean rooms. The second air-conditioning equipment provides forcer air-replacement of the clinic.
Assessment of thermal comfort in a low-energy family house with warm-air heating
Kos, Jan ; Forman, Matěj (referee) ; Jaroš, Michal (advisor)
The task of this master´s thesis is an evaluation of warm-air heating system in a low energy family house from the viewpoint of thermal comfort during winter season. The CFD simulation using CCM+ code was used for this purpose. The environment parameters in the central living room were evaluated for two variants – with underfloor heating and without it. The thermal comfort was evaluated using indices according ČSN EN ISO 7730 standard.
Implementation of the air-ground heat exchangers in condition of the Czech Republic
Macenauerová, Tereza ; Musil, Zdeněk (referee) ; Kolbábek, Antonín (advisor)
This work presents the implementation of ground heat exchangers for air-conditioning systems of buildings in the Czech Republic, especially in south Moravia. The purpose is to find basic information about specific devices - such as the type of heat exchanger, material of pipeline, the method of suction (filtration), outlet of condensate, etc. These are parameters that investor can decide before the realization. Exercise equipment is dependent on the parameters that investor can not decide (eg. type of soil, disposition of land, surrounding climate). The work is based on a questionnaire study (part of junior project FSI-J-12-24) form 2012 which was solved with concrete owners of realized devices. A part of the ground heat exchangers comes from the implementation of energy-efficient houses KARON s.r.o. company, the basic parameters of the these exchangers are provided by its managing director Ing. Stanislav Karasek. Other devices have been traced in the database of passive houses in the Czech Republic - managed by the Passive House in Brno. The work summarizes some of knowledge of owners, shows the most often used types and values the importance of proper design of the whole device.
Energy simulation of ground heat exchanger influence to operation of warm-air heating recuperation unit
Kolbábek, Antonín ; Pešek, Martin (referee) ; Jaroš, Michal (advisor)
The thesis deals with energy simulation of a heat recovery system in coupling with a ground heat exchanger (GHE) in a low-energy family house with warm-air heating and ventilation. The effect of GHE on operation and effectiveness of a heat recovery unit was assessed from the results of the simulation. Next, energy and economic benefits of the heat recovery with and without GHE and consequent savings were evaluated as well. The profitability of the investment was assessed using comparison with the investment costs. Recommendations for the operation of the system were suggested.
Air-conditioning system for the base of football stadium
Hepner, Andrej ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
The bachelor thesis deals with application for design of air-conditioning system for the first floor of the base of football stadium. This work is devided into three parts. The first part is theoretical, which is dedicated to the meteorological bases, the impact of the direct solar radiation on the course of heat gains and on the shading theory. The calculation part deals with the project of two air-conditioning units into two functional units of the object. The ventilation system provides forced ventilation in the building's premi-ses and adjusts the air supply to ensure the required temperature and humidity of the indo-or climate. The last part is the project documentation of ventilation
Air-conditioning system for the base of football stadium
Hepner, Andrej ; Blasinski, Petr (referee) ; Rubinová, Olga (advisor)
The bachelor thesis deals with application for design of air-conditioning system for the first floor of the base of football stadium. This work is devided into three parts. The first part is theoretical, which is dedicated to the meteorological bases, the impact of the direct solar radiation on the course of heat gains and on the shading theory. The calculation part deals with the project of two air-conditioning units into two functional units of the object. The ventilation system provides forced ventilation in the building's premi-ses and adjusts the air supply to ensure the required temperature and humidity of the indo-or climate. The last part is the project documentation of ventilation
Energy simulation of ground heat exchanger influence to operation of warm-air heating recuperation unit
Kolbábek, Antonín ; Pešek, Martin (referee) ; Jaroš, Michal (advisor)
The thesis deals with energy simulation of a heat recovery system in coupling with a ground heat exchanger (GHE) in a low-energy family house with warm-air heating and ventilation. The effect of GHE on operation and effectiveness of a heat recovery unit was assessed from the results of the simulation. Next, energy and economic benefits of the heat recovery with and without GHE and consequent savings were evaluated as well. The profitability of the investment was assessed using comparison with the investment costs. Recommendations for the operation of the system were suggested.
Assessment of thermal comfort in a low-energy family house with warm-air heating
Kos, Jan ; Forman, Matěj (referee) ; Jaroš, Michal (advisor)
The task of this master´s thesis is an evaluation of warm-air heating system in a low energy family house from the viewpoint of thermal comfort during winter season. The CFD simulation using CCM+ code was used for this purpose. The environment parameters in the central living room were evaluated for two variants – with underfloor heating and without it. The thermal comfort was evaluated using indices according ČSN EN ISO 7730 standard.
Implementation of the air-ground heat exchangers in condition of the Czech Republic
Macenauerová, Tereza ; Musil, Zdeněk (referee) ; Kolbábek, Antonín (advisor)
This work presents the implementation of ground heat exchangers for air-conditioning systems of buildings in the Czech Republic, especially in south Moravia. The purpose is to find basic information about specific devices - such as the type of heat exchanger, material of pipeline, the method of suction (filtration), outlet of condensate, etc. These are parameters that investor can decide before the realization. Exercise equipment is dependent on the parameters that investor can not decide (eg. type of soil, disposition of land, surrounding climate). The work is based on a questionnaire study (part of junior project FSI-J-12-24) form 2012 which was solved with concrete owners of realized devices. A part of the ground heat exchangers comes from the implementation of energy-efficient houses KARON s.r.o. company, the basic parameters of the these exchangers are provided by its managing director Ing. Stanislav Karasek. Other devices have been traced in the database of passive houses in the Czech Republic - managed by the Passive House in Brno. The work summarizes some of knowledge of owners, shows the most often used types and values the importance of proper design of the whole device.
Air-conditioning of Department store
Chorý, Vojtěch ; Rubina,, Aleš (referee) ; Rubinová, Olga (advisor)
The topic of this bachelor thesis is design of air-condition equipment for veterinary clinic. The clinic is located on the first floor of a multifunctional building in Brno city. For design purposes is used warm-air heating, air-conditioning and forced air-replacement. The theoretical part is focused on clean room issue. The Project part contains a project documentation for realization of two air-conditioning equipment. The first air-conditioning equipment is designed for warm-air heating and air-conditionig of clean rooms. The second air-conditioning equipment provides forcer air-replacement of the clinic.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.